Standard Operating Procedures for Roots Blowers (Simplified

发布时间:2025-04-03 13:55人气:
**Standard Operating Procedures for Roots Blowers (Simplified Version)**
 
---
 
**1、 Pre startup inspection**
1. * * Mechanical inspection**
-Manually turn the rotor 2-3 times and confirm that there is no blockage in the rotor
-Check the tension of the belt (press down 10-15mm with the thumb)
-The oil level is at 1/2~2/3 of the viewing window (lubricating oil ISO VG68)
 
2. * * System check**
-The intake filter is clean and unobstructed
-The outlet pipeline valve must be fully opened to prevent pressure build-up
-Valve pressure setting ≤ 1.1 times rated value
 
---
 
**2、 Start operation**
1. * * Jogging test**
-Immediately turn off the power after powering on (about 2 seconds), confirm that the steering is consistent with the arrow on the housing
*Reverse rotation can damage the gears*
 
2. * * Formally launched**
-After starting with no load, observe:
-Current ≤ rated value (such as a 55kW motor with a rated current of approximately 100A)
-The bearing temperature should start to rise within 3 minutes (normal heating curve)
-Gradually reduce the outlet valve to the working pressure (adjustment time ≥ 1 minute)
 
---
 
**3、 Operation monitoring**
|* * Parameter * * | * * Normal Range * * | * * Exceeding the Standard Processing * *|
|----------------|-------------------|----------------------------|
|Bearing temperature | ≤ 75 ℃ (can be briefly touched by hand) | ≥ 85 ℃, stop immediately to check lubrication/cooling|
|Motor current | ± 10 rated value | Check load or voltage when exceeding 15|
|Export pressure | ≤ nameplate calibration value | Open the valve or clean the pipeline when overpressure occurs|
|Vibration value | ≤ 4.5mm/s | Abnormal vibration requires dynamic balancing|
 
---
 
**4、 Shutdown program**
1. * * Normal shutdown**
-First, fully open the outlet valve to relieve pressure (for more than 30 seconds)
-Cut off the power again
-Close the intake valve to prevent backflow (especially when transporting hazardous gases)
 
2. * * Emergency stop * * (immediately execute in case of the following situations)
-Smoking or severe vibration
-Sudden increase in bearing temperature>95 ℃
-Continuous current overload alarm
 
---
 
**5、 Key precautions**
1. * * Prohibited behavior**
-Close the outlet valve and start (equipment must be damaged)
-Overpressure operation for more than 10 minutes
-Reverse operation (gear instantaneous damage)
 
2. * * Maintenance cycle**
-Daily: Record pressure/temperature data
-Monthly: Clean the filter and check the belt
-Every year: Replace bearing lubricating oil and check rotor clearance
 
---
 
**6、 Emergency handling of faults**
-* * Sharp abnormal noise * * → Immediately stop the machine and check for rotor collision
-* * Large pressure fluctuations * * → Check if the check valve is malfunctioning
-* * Sudden decrease in air volume * * → Prioritize troubleshooting filter blockage
 
Mastering these 6 steps of operation can ensure the operation of the Paultz fan for more than 10 years. Please refer to the equipment manual for actual operation. Special working conditions (such as transporting flammable gases) require additional explosion-proof measures.
 