Hello, welcome to our official website. We will be dedicated to serving you! If you need to purchase, please contact us by email:178164824@qq.com

全国咨询热线

+86 15508667513

Roots blower-Shandong Changsheng
您的位置:主页 > news information > news >
联系我们

地址:Chengdong Industrial Park, Zhangqiu City, Shandong Province
电话:+86 15508667513

咨询热线+86 15508667513

User Manual for Roots Blower

发布时间:2025-04-21 18:23人气:
**User Manual for Roots Blower**
**(Operation, Installation, Operation and Maintenance Guide)**
 
---
 
**1、 Product Overview**
Roots blower is a type of volumetric gas conveying equipment that forcefully delivers gas through the rotation of two interlocked impellers. It has the characteristics of stable flow rate, no oil pollution, and sturdy structure, and is widely used in industries such as sewage treatment, pneumatic conveying, and chemical engineering.
 
---
 
**2、 Technical parameters (taking typical models as examples)**
|* * Parameter * * | * * Value Range * * | * * Remarks * *|
|-------------------|--------------------------|-----------------------------|
|Flow rate | 0.5~300 m3/min | Customizable according to demand|
|Pressure | 9.8~98 kPa (0.1~1.0 bar) | High pressure type can reach 147 kPa|
|Power | 0.75~355 kW | Matching based on flow rate and pressure|
|Speed | 980~3000 rpm | Low speed is quieter and has a longer lifespan|
|Noise | 75~95 dB (A) | After adding a muffler, it can be reduced to below 70 dB|
|Medium temperature | -10 ℃~80 ℃ | High temperature requires special design|
 
---
 
**3、 Installation Guide**
**1.  Pre installation inspection**
-Confirm that the fan model is consistent with the order and there is no transportation damage.
-Check the oil level (centerline of gearbox oil gauge).
-Manually rotate and confirm that the impeller is not stuck.
 
**2.  Foundation and Fixed**
-The foundation needs to be level (levelness ≤ 0.2 mm/m), and the concrete strength should be ≥ C20.
-Use shock pads or spring dampers (vibration requirement ≤ 4.5 mm/s).
-Add soft connections to import and export pipelines to avoid stress transmission.
 
**3.  Pipeline connection**
-* * Imported * *: Install filters (accuracy ≤ 100 μ m), with straight pipe sections ≥ 2 times the diameter of the pipe.
-* * Export * *: Install check valve+valve (set pressure=1.1 times working pressure).
-* * Exhaust port * *: If harmful gases are being transported, they need to be directed outdoors for treatment.
 
---
 
**4、 Operation steps**
**1.  Preparation before startup**
-Check the tightness of the belt (press with fingers to sink 10-15 mm).
-Confirm that the voltage fluctuation is ≤ ± 5 (380V ± 19V).
-Open the vent valve (after initial start-up or long-term shutdown).
 
**2.  Start and Run**
1. * * Jogging test * *: Stop immediately after starting and confirm the direction of rotation (indicated by the arrow).
2. * * No load operation * *: Gradually close the vent valve and run for 30 minutes. Check:
-Is the current stable (≤ rated value).
-Bearing temperature (≤ 75 ℃).
-Abnormal noise/vibration (vibration value ≤ 4.5 mm/s).
3. * * Load operation * *: Slowly adjust the outlet valve to the desired pressure to avoid instantaneous overpressure.
 
**3.  Shutdown operation**
1. Gradually open the vent valve to unload.
2. Cut off the power and close the inlet and outlet valves.
3. During winter shutdown, it is necessary to drain the cooling water (for water-cooled models).
 
---
 
**5、 Daily maintenance**
**1.  Regular inspection**
|* * Project * * | * * Cycle * * | * * Standard * *|
|------------------|-----------|-----------------------------|
|Lubricating oil status | Weekly | Gear oil is clear and free of emulsification|
|Belt tension | monthly | deflection 10-15 mm (new belt)|
|Impeller clearance | Every 6 months | Radial ≤ 0.3 mm, axial ≤ 0.2 mm|
|Valve calibration | Annual | Jump pressure=1.1 times the working pressure|
 
**2.  Lubrication management**
-* * Gear oil * *: ISO VG220, Replace every 500 hours for the first time and every 2000 hours thereafter.
-* * Bearing grease * *: Molybdenum disulfide lithium based grease, replenished every 1500 hours.
 
**3.  Common fault handling**
|* * Fault phenomenon * * | * * Cause analysis * * | * * Solution * *|
|------------------|---------------------|--------------------------|
|Insufficient air volume | Impeller wear/filter blockage | Adjust clearance or replace filter|
|Abnormal vibration | Bearing damage/poor alignment | Bearing replacement+laser alignment|
|High temperature | Poor lubrication/Overpressure operation | Add oil or check system resistance|
 
---
 
**6、 Precautions**
1. * * Strictly prohibit overpressure operation * *: Valves must be installed at the outlet!
2. * * Prohibit starting with load * *: The vent valve must be opened before starting.
3. Explosion proof requirements: When transporting flammable gases, Ex d Ⅱ BT4 explosion-proof motors should be used.
4. * * Maintenance * *: After shutdown, the power should be cut off and a warning sign should be hung.
 
---
 
**7、 Warranty and after-sales service**
-* * Warranty period * *: 12 months (excluding vulnerable parts).
-* * Service Support * *: Provide remote technical guidance or on-site maintenance (response time ≤ 24 hours).
 
---
 
**Attachment: Explosion diagram and spare parts list * * (see attached materials)
**Emergency contact phone number * *: XXX-XXXXX-XXXX (24-hour service hotline)
 
---  
**Tip * *: This manual is applicable to conventional Roots blowers, and special models (such as high temperature and anti-corrosion types) require reference to specialized technical agreements. Please read the complete content before operation!
 

推荐资讯

+86 15508667513